<strike id="qthel"></strike>
      <li id="qthel"><meter id="qthel"></meter></li>

      <form id="qthel"></form>
      產(chǎn)品banner
      Your current location : Home >> 長(zhǎng)春zinc series phosphating solution

      Service Service

      Contact UsContact Us

      Yingkou kangru Technology Co., Ltd

      Contact: Mr. Zhao

      Telephone: +86-18841775200 

      Address: Steel Industrial Park, Laobian District, Yingkou City, Liaoning Province

      Post Code: 115005

      Website: http://www.softs4humans.com/en



      長(zhǎng)春Steel pipe drawing phosphating solution

      長(zhǎng)春Steel pipe drawing phosphating solution

      • Cname:長(zhǎng)春zinc series phosphating solution
      • Views:Times
      • Release date:2021-01-11 11:14:46
      • Content

      After treatment, a dense and uniform phosphate film is formed on the surface of the workpiece, which is widely used in the drawing of all kinds of steel pipes and the lubrication of stamping parts. The phosphating solution has the advantages of low treatment temperature, fast film formation, easy control and low cost.


      1、 Main technical specifications

      Projects

      Technical index

      Test standard

      appearance

      Light green transparent liquid

      Visual inspection

      Acid value 6%

      Free acid(FA)  Pt

      4.0±0.3

      Neutralization method

      Total acid(TA)  Pt

      22±1.0

      proportion  g/ml

      1.35±0.05

      Specific gravity method

      Appearance of phosphating film

      grey

      GB6807-86

      2、 Main features




      1. In the process of use, the accelerator should be added separately, and the same agent should be used in the tank and the addition, so the operation is simple and the management is convenient.




      2. This product has good stability, less sediment and long service life.




      3. The phosphating film has dense crystal, gray and no ash, which can enhance the lubricity of steel pipe and reduce the comprehensive cost.




      3、 Application method and process parameters




      1. Treatment process: rust removal → neutralization → water washing → phosphating → water washing → wetting agent




      2. The phosphating solution was prepared into 8% working solution, and neutralizer and accelerator were added per ton to make it dissolve and stir evenly.




      3. Process parameters:




      FA: 1.5 ~ 2.5pt, treatment temperature: 55 ~ 65 ℃




      TA: 24 ~ 34pt, treatment time: 5 ~ 10min, accelerator AC: 2 ~ 5pt




      4. As the concentration changes continuously in the continuous treatment process, it is necessary to measure the concentration of each index regularly to keep each index within the specified process concentration range.




      4、 Packaging, storage and transportation




      30kg plastic barrel packaging, storage and transportation temperature not less than 0 ℃.


      Tags

      0

      Recently Viewed:

      Copyright ? Yingkou kangru Technology Co., Ltd support: Yingkou Zhongchuang Network Technology Co., Ltd
      国产精品亚洲А∨天堂2021,亚洲综合色区另类aV无码,思思久99久国内精品视频,韩国精品无码专区久久

      <strike id="qthel"></strike>
        <li id="qthel"><meter id="qthel"></meter></li>

        <form id="qthel"></form>